Open Mobile Navigation
Acelab
Close Mobile Navigation
31 23 00 Excavation and Fill
31 23 16.13 Trenching
Hide
31 23 13
Subgrade Preparation
31 23 16
Excavation
31 23 16.13
Trenching
31 23 16.16
Structural Excavation for Minor Structures
31 23 16.26
Rock Removal
31 23 19
Dewatering
31 23 23
Fill
31 23 23.13
Backfill
31 23 23.23
Compaction
31 23 23.33
Flowable Fill
31 23 23.43
Geofoam
31 23 33
Trenching and Backfilling
31 23 16.13 Trenching
0 Manufacturers
Support